Use at listed colliery

In this listed colliery, only the headframe was to remain of the headframe. The shaft hall was to be demolished and was connected to the headframe via a staircase. This connection had to be severed with the help of welding torches so that it could be torn off with an excavator. However, the shaft hall and staircase were so dilapidated and old that Danger of collapse duration. Therefore, it was only possible to dismantle from outside. A device was required which was based on 40 m high 15 m sideways could range and one Payload of 300 kg owned so that 2 operators including work equipment can work. Our self-propelled telescopic work platform could meet all requirements ST 57 KA with a swiveling basket arm and rotating basket. This made it easy to dismantle the old mine.

You can find further technical data on the device here:

ST 57 KA